News
Making the most of the Christmas shutdown Jan 10, 2024

Making the most of the Christmas shutdown

Buying presents, writing cards to long-lost relatives and stocking up on food and drink — these all need to be done before

you can enjoy the festive break. For manufacturers, this time of year is also a good opportunity to prepare for the year ahead,

by ensuring that their machines and inventories are ready for the challenges of 2024.

Obsolescence management in a manufacturing facility means maintaining systems by sourcing obsolete components in a timely

and cost-efficient way, and the festive period will provide breathing space for this process. During this time, manufacturers can

inspect parts, carry out the necessary upgrades, and if required, order replacements early so they can arrive in time for the new year.

All these steps can be carried out during planned downtime when operations cease, meaning manufacturers can save having to do

these during normal working hours.


Not all legacy machines need replacing and, for those that can be retained, manufacturers can upgrade them in line with emerging

technology by retrofitting more advanced technologies. Drives, sensors and PLCs are the bread and butter of any factory and manufacturers

can integrate older editions with smart capabilities to improve data collection, communication and interoperability.


Although factory floors will be closed over the festive period, many smart technologies can continue running throughout without

requiring human interaction. For example, smart sensors can measure temperature changes, pressure and vibrations, and then make

this data available across the whole factory network. These sensors can also tell manufacturers if a piece of machinery is likely to

break down, giving them time to order a replacement.


Manufacturers can simply program the sensors and monitors before shutting shop, leaving them to collect data on processes and

equipment and generate valuable insights. This will give plant managers a head start in the new year, since having a couple of

weeks’ worth of data can support strategic decisions on how to future-proof processes in the upcoming months.

As manufacturers look forward to a well-earned Christmas break, there are many ways they can make use of the festive period.

Implementing a thorough obsolescence management plan and carrying out vital upgrades, like retrofitting smart technology to

legacy machines, is a good starting point.



SNAT617CHC 61037136
SAMC11POW 57171847
SAFT185TBC 58119687
07KT92 GJR5250500R0262
DSQC679 3HAC028357-001
SAFT121PAC
SAFT112POW
DSMB144 57360001-EL
DSQC639 3HAC025097001
BRC-100 P-HC-BRC-10000000
07AC91 GJR5252300R0101
IMDSI22
SPDSO14
PHARPS62200000
DI811 3BSE008552R1
FI830F 3BDH000032R1
AI830 3BSE008518R1
DI821 3BSE008550R1
DO801 3BSE020510R1
DASA110 3ASC25H705/7
SAFT188IOC
TP854 3BSE025349R1
DSQC662 3HAC026254-001


1756-L55M12
1756-L55M13
1756-L61S
1756-L63
1756-L63XT
1756-L64
1756-L65
1756-L71S
1756-L72
1756-LSC8XIB8I
1756-LSP
1756-OB16D
1756-OF6VI
1756-PA75R
1756-PB75
1756-RIO
1756-RMC3
1756SC-IF8H
1757-SRM
1768-EWEB
1769-ADN
1769-BA
1769-IQ32


3500/22M 288055-01
3500/33 149986-01
3500/60 163179-01
3500/72M 176449-08
3500/62 163179-03
3500/40M 140734-01
330500-02-00
135137-01
149992-02
147663-01
3500/94  145988-01
140482-01
330500-00-20
170133-090-00
3500/32M 149986-02
1900/65A 172323-01
330180-X0-05
125720-01
125760-01
125768-01
128229-01
128240-01
133396-01


We still have a lot of PLC/DCS/TSI/ESD Module in stock, contact us quickly for prices.

Leave A Message

Leave A Message
If you have questions or suggestions,please leave us a message,we will reply you as soon as we can!
Submit

Home

Products

Contact

whatsapp